Hot and cold water pipework design

As a domestic installer, you may be predominantly installing small hot and cold water systems in single dwellings; however, there may be situations whereby you have been asked to quote for a standard installation in a larger building with multiple residential properties.

If you are planning on installing a larger system without the relevant experience and knowledge, it is important to note the statements below from the Engineering Council ethical principles. Engineering professionals have a duty to acquire and use wisely the understanding, knowledge and skills needed to perform their role.

They should:

– always act with care – perform services only in areas in which they are currently competent or under competent supervision

– assist the development of engineering knowledge and skills in others

– keep their knowledge and skills up to date

– present and review theory, evidence and interpretation honestly, accurately, objectively and without bias, while respecting reasoned alternative views identify, evaluate, quantify, mitigate and manage risks

– not knowingly mislead or allow others to be misled


A large multi-dwelling project might look like a very profitable prospect at the start. However, if you feel that you may not have the adequate experience and skills required to design the job, then it is recommended that you consult a qualified engineer. It may be beneficial to seek the services of an Incorporated or Chartered Engineer, whom are registered and verified by the Engineering Council in this field of expertise.

The method in BS EN 806-3 is used for calculating the hot and cold water pipe size in multiple residential buildings, yet if it is used for single residential dwellings then the pipework is at risk of being oversized. Therefore, in the instance of a single dwelling, it is recommended that the designer or installer carries out a rational assessment of the design flow rate on a case-by-case basis.

It is also important to note that the method illustrated within this article is not to be used for commercial buildings. When working in that setting, the LU methods detailed in BS EN 8558 and the CIPHE Plumbing Engineering Services Design Guide should be used. The loading units (LU) within BS EN 806-3 (see figure 1, above) take into account the flow rates at the draw-off point, the length of time the appliance is in use and the frequency of use. One loading unit (1 LU) equates to a draw-off flow rate QA of 0,1 l/s.

BS EN 806-3 is a simplified method and therefore the designer may utilise a series of tables to calculate the correct pipe size for different pipework material types. There are eight different pipe types available within the standard to choose from, but for the purpose of the simple example referred to within this article, the table for copper pipework has been used (see figure 2, below).


Step 1:

Draw a simple schematic

Before carrying out any pipe sizing calculations, it is critical to understand the type of installation that you are designing and what the pressure conditions and flow velocities are. The standard states that a static pressure of 500 kPa or 5 Bar is to be present at each outlet with a minimum flow pressure of 100 kPa or 1 bar available also at each outlet. However, if there are valves – such as a thermostatic mixing valve (TMV) – then the manufacturers’ minimum requirements need to be consulted. The pipe sizing figures stated within figure 2 are based upon a maximum flow velocity for header and riser pipes of 2 m/s and for pipes leading to outlets (dead legs) at 4 m/s, nonetheless consideration needs to be applied to ensure maximum flow velocities are used to prevent the effect of water hammer and noise.

Draw a simple pipe schematic including all of the outlets (see example in figure 3.


Step 2:

Calculate the total number of loading units

Using figure 4 add up the total number of loading units that will be supplied by the pipe labelled A in figure 3. Beginning at the last draw-off point, the loading units for each section of the installation have to be determined.


Step 3:

Select the required pipe size

The peak simultaneous demand has already been taken into consideration within the tables in figure 2, therefore you would simply select the correct pipe size that corresponds to the total number of loading units. In the case of the example, a 28mm copper pipe is chosen. The maximum number of loading units allowable for a 28mm copper pipe is 50 LU according to figure 2.

Using the graph in Annex B of BS EN 806-3 (figure 5)

It is worth noting that within the Annex B of BS EN 806-3 (figure 5), the user can calculate the maximum simultaneous design flow rate whereby the user has more control over the maximum pressure loss per metre of pipe and the maximum velocity. As per figure 5, the calculated loading units of 24 LU has been plotted against the highest single value LU curve of 4 which corresponds to peak simultaneous demand of 0.8 l/s.

Using the example in figure 5 and having established the design flow rate, the water pressure that is required can be established before calculating the pipe diameter. The water pressure is divided into the following:

(a) The required pressure to operate the outlet fitting, eg shower

(b) The vertical static head pressure from the point of supply to the fitting

(c) The head loss due to the total pipe length, the number or type of valves and fittings

(d) The available pressure at water main inlet into the property

The CIPHE is currently creating a digital pipe sizing tool for members to use for guidance.

Using the equations demonstrated in CIBSE Guide C with the use of the Haaland equation for pipe pressure loss, the final pipe size applicable to a flow rate of 0.8 l/s equates to a pressure loss per metre of pipe of 998 Pa with a flow velocity of 1.5 m/s. With this in mind, an equivalent length of 50 metres of cold pipework equates to a total pressure loss in the pipework of 49,900 Pa or 0.49 Bar. Therefore it is important to make sure the flow pressure (for example 1 Bar) is available at each outlet (subject to the outlet type) when calculating the pressure difference between the inlet to the property and each draw-off outlet.

This article first appeared in the Jan/Feb 2019 issue of P&H Engineering, the magazine for members of the CIPHE. Find out how to join here.

You might also like

The role of heat interface units (HIUs) in modern heat networks

The role of heat interface units (HIUs) in modern heat networks

How to install press-fit pipework for ACR systems

How to install press-fit pipework for ACR systems

How to achieve optimal water flow rates and pressure

How to achieve optimal water flow rates and pressure